Download PDF

Ali Adel

Architectural Engineer

Objectives

  • Seeking a challenging job opportunity in engineering of finishing, coordination roles and engineering consultancy roles in a well reputed firm, using the latest knowledge & engineering.
  • I believe that your company is an impressive company whose values I share, I thrive in a fast-paced, collaborative, innovative environment and I know that I have the skills, experience, and attitude to excel in this position.
  • I would love to have the opportunity to meet and discuss what I can bring to this role more fully in your respectable firm. Reach me at my mobile number and email.

Summary

  • Having 12 years of experience in construction field as an Architect & finishing engineer doing Construction, QC, Site supervision and Project management.
  • I have worked and gained a good experience in healthcare projects, hotels, administrative, cultural and residential projects such as: 

El-Salam International Hospital (KIH previously) , MADINATY City (B3 buildings, East Hub Mall & Privado residential complex) , BARCLAYS BANK EGYPT CONSOLODATION PROJECT (Al Togary wafa currently), CITY STARS SHARM ELSHEIKH (Fairmont hotel), TULIP TABA HOTEL and AL-AZHAR NEW LIBIRARY, Mansura 8 ( Central Bank print house ) and National bank of Egypt, Citadel New Capital. 

  • I thrive in a fast-paced, collaborative and innovative environment and I know that I have the skills, experience, and attitude to excel in position which I'm looking forward.

Work experience

Senior Architect & project coordinator

Citadel commercial complex
  • Assume full responsibility for all architectural aspects and coordination works within the Citadel commercial complex, ensuring seamless collaboration between various trades.
  • Act as the primary point of contact for the owner, attending technical and progress meetings, addressing inquiries, and providing necessary data and updates.
  • Collaborate closely with the planning team to prioritize tasks and ensure efficient project execution.
  • Review and approve all materials submittals, drawings, technical issues/inquiries, work method statements, and RFIs, ensuring compliance with project requirements and industry standards.
  • Conduct inspections and material inspections for all interior items, ensuring adherence to quality standards and specifications.
  • Effectively communicate with stakeholders, explaining technical concepts in a manner easily understood by non-technical individuals.
  • Ensure consistency and accuracy in all documentation, avoiding jargon and using clear and concise language.
  • Diligently perform proofreading and quality checks to eliminate errors and inaccuracies in all project-related documents and communications.

Senior site engineer present as Section head

East Hub Mall - Madinaty City
  • Managed a team of 2 engineers and 3 supervisors, effectively coordinating their tasks and ensuring smooth operations.
  • Successfully oversaw the construction of the outer and inner facades of East Hub Mall in Madinaty City, including shop facades and corridors ceilings.
  • Installing curtain walls with Alumil profiles system, aluminum claddings, securit, and granite cladding , resulting in a visually appealing and durable exterior.
  • Implemented high-quality finishes for the mall's facades, ensuring a professional and aesthetically pleasing appearance.
  • Completed void closures for the mall, providing a seamless and secure environment for visitors and shops staff.
  • Installed aluminum claddings, gypsum boards, and WPC materials for the mall's ceilings, creating a visually appealing and functional space.
  • Maintained consistent communication with stakeholders, ensuring their requirements were met and addressing any concerns promptly.
  • Conducted regular quality checks and handed over finished works to the QC team and project consultant, ensuring compliance with project specifications and client expectations.

Team leader site Arch engineer

Privado residential buildings-Madinaty City
  • Oversaw the completion of exterior and interior finishing items for four buildings and a 12,000 square meter basement in Privado residential buildings, Madinaty City, ensuring high-quality workmanship and adherence to architectural engineering standards.
  • Managed a team of two engineers and four supervisors, effectively coordinating their tasks and ensuring smooth operations throughout the construction process.
  • Supervised construction activities, promptly addressing site RFIs and providing timely solutions to ensure project progress and quality.
  • Collaborated with the technical office to review and approve detailed drawings, ensuring accurate implementation of design specifications.
  • Coordinated material deliveries and processed subcontractor payment requests, ensuring timely availability of resources and smooth workflow.
  • Generated comprehensive reports on work progress and expectations, aligning with the site work plan and providing accurate updates to stakeholders.

Seashell Playa Resort project

North cost - AL Alamein
  • Responsible for all exterior/interior finishing and coordination works of "U1" and "U2" buildings.
  • Attending all meetings for works arrangement between all trades.
  • Reviewing all sub contractors payment requests to be certified.
  • Lead a team consists of 5 engineers and 7 supervisors, coordinating & arranging work priorities with them and delegating tasks.
  • Making reports regarding the work progress and expectations according to site work plan.
  • Took full responsibility for the construction and finishing of apartment prototypes, ensuring they met the owner's requirements and expectations

** National Bank of Egypt (NBE) - New Capital

Built up area 73K m2-Project Budget 500,000,000 EGP
  • Led a team of engineers and supervisors, effectively coordinating and prioritizing work tasks to ensure the timely completion of a high-budget project for the National Bank of Egypt (NBE).
  • Oversaw all façade and basement works, including masonry, plaster, white mortar, screed, curbstone, ceramic and marble cladding (mechanical installation), curtain walls, steel and wooden doors, terrazzo tiling, and painting.
  • Managed and supervised construction activities, ensuring adherence to architectural engineering standards and providing timely solutions to site RFIs.
  • Collaborated with the technical office to review and approve detailed drawings, coordinate material deliveries, and process subcontractors payment requests.
  • Conducted thorough quality control inspections and handed over finished works to the QC team and project consultant, ensuring compliance with project specifications and client expectations.

Central Bank Print house - New Capital

Budget 4,000,000,000 EGP / Total area 130000 m2
  • Oversaw and managed all finishing activities, including block work, plastering, false ceiling, gypsum walls, glass partitions, painting, tiling, marble works, and parquet flooring, ensuring high-quality and timely completion.
  • Develop and implement weekly and daily target schedules for various activities, optimizing productivity and ensuring efficient project execution.
  • Review specifications, relevant standards, and Bill of Quantities (BOQ) to ensure compliance with project requirements, specifications, and drawings.
  • Ensured adherence to approved method statements and monitored the execution of work to maintain quality standards.
  • Managed and supervised general supervisors, allocating work areas and coordinating their responsibilities.
  • Collaborated with subcontractors, monitoring their daily construction activities, ensuring compliance with contractual obligations, and maintaining effective communication.
  • Review and certify payment certificates of subcontractors, ensuring accurate and fair compensation for their work.

Al Azhar new grand library project:

Budget: 360Mil EGP / Total area 31.391 m2
  • Managed, Oversaw and completed the exterior finishes of the Al Azhar new grand library project, including marble and granite facades, aluminum works, plaster, paintings, and GRC decorative panels.
  • Successfully completed interior finishes for the Mezzanine floor, including screed flooring, linoleum flooring, aluminum partitions, steel fabrications, frameless glass partitions, Wooden panels ceiling, Wooden flooring for the library stage, and HPL works at bathrooms.
  • Coordinated with electromechanical departments to implement infrastructure of the general site , including rain drainage network, firefighting network, and electrical duct banks.
  • Ensured efficient usage of materials to minimize wastage and supervised the materials storage area.
  • Coordinated and monitored subcontractors' daily construction activities and ensured their obligations were met in addition too monitoring a big stuff of craftsmen of painting works, Gypsum boards, plaster works, masonry works and carpenters.
  • Review and certify payment certificates for subcontractors.
    Became a key person for the site manager, resolved issues with items such as painting, linoleum flooring, GRP cladding for museum walls, project stairs, and stage, which ensured successful project completion.
  • Completed all responsibilities within the required time frame.

City Stars Sharm El Sheikh project (Golden Coast Resort) :

Fairmont Hotel project

Responsible for renovation and modification works of two key buildings H6 & H7 (which consists of 174 classic & superior hotel rooms in additional to 8 suites) as a manager for all architectural works and as a coordinator for all electromechanical works :-

  • Responsible for all finishing activities such as but not limited to block work & plastering, false ceiling, gypsum walls and painting, tiling and marble works.
  • Responsible for arrangement between all of the finishing, electrical and mechanical works.
  • Preparing inspection requests in conjunction with Quality Control Manager and by coordination with the Construction Manager in following up the handing over to the consultant.
  • Overall, supervision and coordination of General Foreman areas of responsibilities and the allocation of work areas.
Apr 2014Oct 2016

Architect

Rafat Miller Consulting (RMC)

Responsible for supervision of all architectural works on site & materials that enter the site and reviewing all shop drawings issues, Architectural method statements & another construction submittals as per project specs and requirements.

In addition to completing progress reports, performing snag/defects lists for the project before being handed over to the owner & remedial works and was responsible for day to day Project Management and site Coordination.

Al Salam International Hospital - Katamya international Hospital previously (KIH)

Main contractor: Orascom / Built-up; 21,230 m2 /

Accomplishments:

  • Clint facing, attending meetings, completing progress report and day to day
    project management & site coordination.
  • Doing all inspections requests and Material inspection requests for all interior items such as: (Masonry, Plaster, Screed, Insulation, Gypsum board
    partitions/cladding, Gypsum board false ceiling, Air tied tiles false ceiling, Metal tiles false ceiling, Ceramic flooring/walls, Sornaga flooring, Vinyl flooring, Raised floor, cement tiles, Wooden cladding for walls, Fenomastic paintings, Metal fabrications, Granite flooring for stairs, Wooden/Metal doors, Wall protection items, Glass partitions/windows and Fire rated sealant works) as per specs in coordination with other trades.
  • Doing inspection requests and material inspection requests for all exterior
    items such as: (Aluminum Cladding for facades & the main entrance steel canopy, spider system glass panels for the main entrance canopy, Curtain walls, Aluminum fixed windows, Aluminum louvers, Masonry works, Plaster, Paintings, Plaster board cladding, Insulation, Steel ladders) as per specs in coordination with other trades.
  • Doing inspection requests & material inspection requests for landscape items such as: (Slate tiles flooring, Insulation, Masonry works, Planting boxes, Granite flooring and stainless steel works).
  • Reviewing all submittals package for the above mentioned interior and exterior items including hardware sets.
  • Reviewing work method statements for: waterproofing & thermal insulation, All of Gypsum board items in the projects, All of painting types, and Vinyl flooring method-statement.

Barclays Bank Corporate Offices (currently Attijariwafa Bank)

City stars Cairo"Star Capital 1" - Built-up 12,000 m2

Accomplishments:

  • Doing all inspections requests and Material inspection requests for all interior items such as: (Wooden case work, Office furniture, Masonry works, Plaster, Screed, Insulation, Gypsum board partitions/cladding, Gypsum board/tiles false ceiling, Ceramic flooring/walls, Vinyl flooring, Raised floor, Wooden cladding/partitions for walls, Fenomastic paintings, Wooden doors, Glass partitions and Fire rated sealant works) as per specs in coordination with other trades.
  • Reviewing most shop drawings issues, requests for proposals for the most of items.
  • Completing progress report.
  • performing snag/defects lists and remedial works.

Madinaty City project

two residential buildings at Sector B3 - Group 32

Responsible for all of finishing activities for two buildings called Type 600, each building consist of 7 floors with two residential apartments for each floor with 270m2 for each apartment using the listed & approved materials based on designs as per implementation methodology :-

  • Responsible for interior finishing items such as but not limited to: Block work, Plaster, Gypsum Cornices, Ceramic flooring/walls, Porcelain flooring, Wooden doors, HDF flooring, Cement tiles, Sanitary ware, Insulation, Marble flooring for corridors & stairs and Metal fire rated doors for emergency stairs.
  • Responsible for exterior finishing items such but no limited to: Block work, Plaster, Insulation, Cement tiles, Metal fabrications, Gypsum Cornices, Paintings and ridge tiles.

Accomplishments:

  • Handed over all of apartments to The city's agency to be approved for handing over to clients.
  • Handed over all of apartments to clients.

Skills

9
Microsoft office
  • Microsoft Word
  • Excel
  • PowerPoint
  • Outlook
9
Computer-Aided Design
  • AutoCAD.
  • Autodesk Revit Arch .
7
Boundary Element Method
  • Revit Architecture.

Education

20072012

Bachelor degree of Engineering: B.S. Architecture.

Modern Academy for Engineering & Technology

Cairo, Egypt.

20042007

High School

Ismail Al Qabbani high school