Complete Logistical Services 2/2017-4/2017 Roughneck The job was located on Noble's Bob Douglas. A deep water drillship. Performed typical tripping operations
Core Resources Group 1/2019-5/2019 Roughneck This job was on an Offshore H&P platform/production rig. Trained of 2 different types of casing tong to operate during tripping operations. The depth of the well was 24,543ft. Slip and cut drill line. preventive maintenance on all drilling equipment. Use spinner hawk, and rig tongs when casing tongs were broke down.
AGR 12/2024-2/2024 Spooling Winch Operator The job was on a Valaris deepwater drillship. Replace the wire rope on all four of the NOV 120 mega ton knuckle boom cranes. Responsible for operating the spooling winch when removing old wire rope.
EPI Group 2/2025-9/2025 Acoustic Deployment Specialist Travel by plane, meet scheduled transport to be taken to the Rhode Island Port to board the vessel. Deploying and recovering acoustic buoys and 600kg clump weights for each wind turbine.